David Prouty High School
Spencer, Massachusetts

Dore & Whittier was retained to be the Owner’s Project Manager for the Spencer-East Brookfield Regional School District and the potential renovations/addition to the Prouty High School.

The project is currently on hold.

The Feasibility Study and Schematic Design phase of the project will address the following items:

  • Lifecycle costs of operating the school as it relates to future operational budgets
  • Massachusetts High Performance Green Schools Guidelines (MA-CHPS Guidelines)
  • Analysis of CM-at-Risk Delivery Method
  • Project goals:
    • New roof, new HVAC system and building façade renovation
    • Maximize the utilization of existing space
    • Maximize grand funding by utilizing Massachusetts High Performance Green Schools Guidelines (MA-CHPS Guidelines)
    • Provide adequate information to district towns regarding scope and cost of project
    • Develop a plan to minimize the disruption and use of the existing facilities during renovations and construction

Project Details

Owner Spencer East Brookfield School District
Completed In progress
Cost $12-40 million
SQ. FT. 100,000